Occasionally, we have clients with residential drainage problems. Sometimes the solution is obvious and sometimes it is not. Obvious or not, many times you need to seek professional assistance to determine a solution. Below are five common types residential drainage problems that we have helped home owners solve and suggested solutions.

  1. Ponding Water

Often times low areas that trap water may exist on a property. Depending upon where these areas are located they can contribute to flooding or water damage if they are close to a building. Different conditions require different solutions.

Sometimes the problem can be attributed to erosion that has altered drainage patterns to create the low spot or it can be that an area was graded improperly. In each a case, regrading the area to remove sediment deposits due to erosion or reshaping the terrain to drain in a positive manner in conjunction with stabilizing the area with ground cover may be the answer. This could be as simple as a DIY project with a shovel or could require a contractor with mechanized equipment.

In certain situations, regrading may not be the answer but the installation of a drainage structure in the low area. This may beyond the scope of a normal DIY project and could be a solution that requires mechanized equipment or hiring a contractor to install the drain and insure that it drains properly.

  1. Eroding Soil

    Eroding Slope Temporarily Stabilized with Haybales

This common problem usually is caused by mishandled surface water but can be the result of other problems such as steep slopes that are not stabilized. When a large quantity of storm water is draining to a steep slope, erosion is bound to occur. Sometimes lining the eroding area with large stone (aka, rip-rap) can remedy the problem. However, we have seen instances where this does not work in areas where a considerable area is draining toward the slope. Drainage structures may have to be installed to capture the stormwater before it reaches the slope and pipe it to a discharge point with less erosion potential.

  1. Drainage Structure Damage or Improper Installation

Damaged drainage structures can cause a variety of problems. Storm drainage structures are intended to capture, contain, and convey storm water. If a drainage structure is damaged, it may not adequately perform any of these intended functions. One of our clients had a residential drainage problem that consisted of storm water ponding in a depressed area adjacent to his back porch. Part of the problem was that the depressed area was located next to an exposed drainage pipe that had been pushed out of the ground and ruptured due to tree root growth. Every time it rained heavily, this broken pipe was filling the depressed area with water. It was obvious that the pipe needed to be replaced and relocated to accommodate the tree root growth while providing positive drainage. Also, the depressed area required a drain to be installed.

  1. Clogged Drainage Structures or Channels

Internal Clogged Drain Pipe Found in this Trench Drain

A clogged drainage structure, such as a pipe or drain, or a drainage channel can cause a variety of problems. One of our clients had stormwater entering a door of their building. Outside of the door was a trench drain that should have addressed the problem. However, unbeknown to the client, the pipe inside the drain was clogged (and undersized) which prevented the drain from working properly. The obvious recommendation was to replace the pipe with a larger pipe that would not be so easily clogged.

One of our residential clients, who had a variety of residential drainage problems, had a pipe that discharged into a ditch/channel that had filled in with debris and clogged. This was causing stormwater to drain through his yard and eventually to a steep creek bank. The creek bank had severely eroded due to this concentrated flow of stormwater. We recommended that this homeowner excavate the clogged ditch to restore the channel to its originally installed condition.

drainage engineer

 Undersized Pipe

  1. Undersized Drainage Pipes or Channels

Undersized drainage pipes or channels are not always an obvious problem. They may only cause problems in torrential rains and work fine most of the time. However, when these pipes or channels create a problem, the problem can be a significant problem that no one saw coming. One of our industrial clients had an undersized pipe that drained a creek (along with the rest of their site) that flowed through their site. Most of the time the pipe worked well to drain the creek and the site. However, when a large storm even occurred their loading dock and other areas flooded. The solution to this problem my seem obvious, just install a larger pipe to better drain the creek and site. However, here is where an expert needs to be consulted to answer the question, “How large should the new pipe be?” In this case a design professional knowledgeable in the design of storm sewer is a must.

Summary

Some residential drainage problems are obvious and some are not. Sometimes problems can take years to develop or only be obvious during infrequent storm events. It is important to get an expert involved before property damage or even dangerous conditions develop. Drainage problems can be costly but can be more costly if left unresolved.

How to Get a Good Land Survey

September 28, 2018

When developing real estate, a good land survey is important. Many times clients come to us with old surveys or surveys that simply do not have enough information to adequately analyze the property for problems or develop detailed civil/site plans. In many cases, we recommend that the client have their survey revised to include the additional needed information or that they start over altogether.

Below are some things to think about before you get ready to engage a land surveyor:

To ALTA or Not to ALTA

In many situations we recommend that our clients obtain an American Land Title Association, or ALTA, survey. Obtaining an ALTA survey not only engages the effort of a registered land surveyor but also a title attorney. The title attorney will perform a detailed search for any encumbrances on the property and generate a report of their findings. This is known as a title report. The title report is then given to the surveyor who can put any found encumbrances on the survey such as easements, deeding of property to neighbors or local departments of transportation. When property changes hands or easements are granted, the transaction doesn’t always get disclosed. An ALTA survey should bring such things to light.

Location of Underground Utilities

Many-a-dollar has been lost by not requiring the land surveyor to have a private utility locator to locate underground utilities that are difficult if not impossible to locate otherwise. It is very important to have such underground utilities such as natural gas, power, water lines, and communication lines just to name a few. In our experience working around hospitals, you can find there are additional utilities that need to be located such as medical gas lines, steam lines, or chiller lines. All of these are important to locate up front as locating them while under construction usually results in surprise costs and delays.

Every Which Way but Up

Topography is also essential as it can help to obtain ideas about how the site and proposed building may function. It can help to answer questions such as: Will retaining walls be necessary? Will dirt have to be hauled from or in to the site to develop it? It can also be helpful to see how feasible it may be to connect to a gravity utility such as sanitary sewer. For example, I have seen sites that were situated in a “hole” from the road and the sanitary sewer was at the street. Situations such as this can affect project cost and feasibility.

Summary

It is a good idea for more reasons than mentioned above to get a quality land survey. One key to ending up with a good land survey is knowing what you need and how to communicate those needs to the surveyor. At Partain Engineering, we have assisted numerous clients ordering surveys. If you would like assistance in obtaining a survey, then simply go to our contact page and email us.

I had a client who had purchased a 1 acre piece of property for $250,000 to build a community center in close proximity to a college campus. The real estate agent had told this client that the property was completely usable except an area at the rear of the property where there was a small stream. It turns out that this small stream drained several square miles upstream of the site, i.e. the stream was not so small.

As I begin to dig into the details of this site, the stream had a buffer associated it, (like most streams in Georgia, that’s where this site is located). However, due to it’s proximity to a water intake downstream, the normal 50-ft buffer requirement was required to be doubled to 100-ft.

In addition to the buffers, almost the entire property from curb to stream was in the 100-year federally regulated floodplain. See excerpt from FEMA floodplain map below (the flood plain area is in cyan and the approximate parcel area is traced in red).

With some clever landplaning we were able to develop a plan that allowed the construction of the client’s building (albeit on stilts) and a small parking lot utilizing ¼ of an acre of land. This was about all the usable acreage that could be developed and still meet the stringent stream buffer and floodplain requirements.

Net result, about a quarter of the land the client purchased was actually usable. That’s right, the effective cost of the usable land was $1,000,000/acre.

This is not the first time we have seen a similar situation and I’m quite sure it won’t be the last. It is so important to hire a site planning consultant to investigate the restrictions on a piece of property that may not be obvious at first glance BEFORE purchasing the property. :-) 

driveway on state route Partain Engineering, LLCLast year, the Georgia Department of Transportation revised its regulations for driveways and encroachments into state right-of-way. Much of the manual has not changed. However, some of the revisions the state has made may affect your project planning and cost:

  • Driveway spacing criteria has been revised to require driveways to be farther apart. The revisions apply to the spacing of offset driveways on the opposite side of the street.
  • The spacing requirement for signalized intersections has increased from 1000-ft to 1320-ft in urban areas and has doubled from 1320-ft to 2640-ft in rural areas.
  • If you wish to remove dirt from the right-of-way in front of your property, GDOT can either set the price per yard or ask that you haul it to a location they specify. The previous version of the manual set the compensation price at $1.00/cubic yard.
  • More detail is required for plan submittal to show billboards. Also, tree inventories are required if tree removal is proposed in the right-of-way.
  • For deeding of right-of-way for road improvements, more information is required to show a clear title, including preliminary and final title reports. These must be furnished by the applicant proposing the road improvements.

Having access to a proposed development is a key determinant in whether a project is feasible and can move forward to examine other issues of feasibility. Increased spacing of driveways and traffic signals could cause significant access challenges for some sites, possibly rendering them unusable. Site circulation may be affected for sites where access is not an issue.

The subjectivity of GDOT compensation terms for cut in the right-of-way could negatively affect project cost and should be considered in the planning stages of a project. Also, additional project design costs will likely result from having to identify billboards and inventory trees on plans as well as providing the necessary documentation to show a clear title for deeding of right-of-way.

Your project civil engineer should be aware of these requirements and be able to help you navigate through them. However, engaging the professional engineer in the early stages of project planning may prevent the new regulations from being a stumbling block later.

bio retention area Partain Engineering metro Atlanta, GA civil engineering firmBio retention areas are one of the best management practices (BMP’s), or methods, by which storm water can be filtered as required by many municipalities in metro Atlanta and other areas. A bio retention area is a filter consisting of various layers of filter media. As layered from bottom to top, there is a gravel area with under-drains, a depth of engineered soil designed to drain water, and a 3-inch layer of mulch on top planted with specific landscaping. The landscaping used for bio retention areas is not only tolerant to inundation of water, but also absorbs pollutants. The mulch filters larger particles of pollution in incoming stormwater, holds moisture for the vegetation, and prevents erosion of the soil below.  Engineered soil filters the fine particles of pollution, and the gravel under-bed collects the water filtered from above and pipes it into the storm sewer system downstream. All elements act together to filter the initial runoff which contains the greatest amount of pollutants.

bio retention area Partain Engineering

One of Partain Engineering’s recently completed projects is a fellowship hall addition to Johns Creek Presbyterian Church in Johns Creek, GA. In order to meet the city’s water quality requirements, we designed a bio retention area to provide water quality for the proposed impervious area. A bio retention area was selected due to the city’s restrictions and site constraints and was added adjacent to the site’s existing stormwater detention facility.bio retention area Partain Engineering metro Atlanta, GA civil engineering firm

While a bio retention area is more expensive than some BMP’s that might have been allowed in other municipalities, it can be an attractive alternative to treat stormwater while, at the same time, meeting city requirements. This measure can also, in some cases, help reduce or eliminate the need for stormwater detention.